Basketball court suspended assembly floor installation construction standard is introduced

by:CSSSLD     2021-02-03
( A) Suspension assembly floor basketball court requirements for the shop installs the ground foundation construction: the underlying cement leveling, no obvious hole, drum; Without waterproof processing, & plusmn; 30° The environment can be construction. Bento equipment apart, do not need to use glue. Just directly on the flat cement or asphalt on the ground, to snap button connection between floors.
( 2) Assembling the floor heat bilges cold shrink coefficient of edge is 2 & permil; - 3‰ , need to set aside places around so must heat bilges cold shrink elastic area ( About five ㎝ wide) Article, according to place on product equipped with edge, edge article 5 ㎝ / 25 cm long, wide beautiful fixed effect.
( 3) Crossed place line using polypropylene surface paint, not falling. Circular area of wicked part, choose the same color of the surface paint, paint and the main body of the same color.

( 4) Movement function recovery rate is as high as 95 ﹪, sliding friction coefficient of 0. 52.
( 5) The heat bilges cold shrink coefficient of heat bilges cold shrink to assemble the floor is 2 & permil; - 3‰ , so that the elastic value, on the left and right, two split seams of the floor is not fit tightly together, but some have aperture, ensures that every two split the elasticity of the floor; On the up and down direction, does not constitute a assembled floor and empty on the floor; Plus places around reserved elastic area, to ensure that the use of the whole place.