Suspension basketball court assembled floor is currently used in the life.
Number of site types, to popularize the suspension under the basketball court assembled the installation of the floor.
a. Construction basic requirements
just put the grassroots cement leveling ( With a 3 m straight edge measurement & plusmn; 3毫米) , without obvious pit, drum; Without waterproof processing, & plusmn; 30 ℃ environment can be construction. Remove the simple installation, without using glue. On flat cement or asphalt can be directly laid on the ground, assembled to snap button connection between floor, use rubber hammer is fixed.
2. Graphics crossed
site use polypropylene surface paint line, don't fall off. Prominent part of the circular area, use the same color of the surface paint, paint and the main body of the same color.
3. Edge banding
to assemble the floor heat bilges cold shrink coefficient for 2 & permil; - 3‰ Around, so the field need to set aside a certain heat bilges cold shrink scaling area ( About five ㎝ wide) , according to the site area is equipped with, while article 5 ㎝ / 25 cm long and wide as beautiful and fixed effect.
4. Setup time
are usually four less than eight hours to complete a standard basketball court shop
5. Athletic performance
ball bounce rate is as high as 95, the sliding friction coefficient 0. 52, sports shock absorption rate reaches over 15%, the properties and the sports special wood floor is very close.
6. Non-slip
special soft double cross antiskid stripes, anti-skid and can follow one's inclinations to deliver strong sports power, to prevent sports injury sprain, wines, etc.
7. Color
suspension assembly of dumb light of floor surface after treatment, with bright lighting, do not absorb light and reflective dazzling, can better protect your eyes, not easily get tired.
eight. About basketball stand
basketball stand area is reserved, basketball stand is on the ground, will not affect the assembly shop of the floor.
9. Heat bilges cold shrink
to assemble the floor heat bilges cold shrink coefficient is 2 & permil; - 3‰ , such expansion value, on the up and down direction, will not result in assembled with the ground floor empty; On the left and right, two split seams of the floor is not fit tightly together, but have a certain gap, ensures that every two split the expansion of the floor; Around plus field reserved expansion area, to ensure that the use effect of the entire site.
10. Foundation problems
each movement assembled at the bottom of the floor is 676 valid point, on the one hand, has played a very good shock absorption, cushioning effect, on the other hand also make sports strength evenly scattered in all directions. In this way, if I have a little pit on site, regardless of the little hole in what position, will not affect assembly floor balanced force. If is obvious pit, drums, is sure to deal with before construction.
a. Construction basic requirements
just put the grassroots cement leveling ( With a 3 m straight edge measurement & plusmn; 3毫米) , without obvious pit, drum; Without waterproof processing, & plusmn; 30 ℃ environment can be construction. Remove the simple installation, without using glue. On flat cement or asphalt can be directly laid on the ground, assembled to snap button connection between floor, use rubber hammer is fixed.
2. Graphics crossed
site use polypropylene surface paint line, don't fall off. Prominent part of the circular area, use the same color of the surface paint, paint and the main body of the same color.
3. Edge banding
to assemble the floor heat bilges cold shrink coefficient for 2 & permil; - 3‰ Around, so the field need to set aside a certain heat bilges cold shrink scaling area ( About five ㎝ wide) , according to the site area is equipped with, while article 5 ㎝ / 25 cm long and wide as beautiful and fixed effect.
4. Setup time
are usually four less than eight hours to complete a standard basketball court shop
5. Athletic performance
ball bounce rate is as high as 95, the sliding friction coefficient 0. 52, sports shock absorption rate reaches over 15%, the properties and the sports special wood floor is very close.
6. Non-slip
special soft double cross antiskid stripes, anti-skid and can follow one's inclinations to deliver strong sports power, to prevent sports injury sprain, wines, etc.
7. Color
suspension assembly of dumb light of floor surface after treatment, with bright lighting, do not absorb light and reflective dazzling, can better protect your eyes, not easily get tired.
eight. About basketball stand
basketball stand area is reserved, basketball stand is on the ground, will not affect the assembly shop of the floor.
9. Heat bilges cold shrink
to assemble the floor heat bilges cold shrink coefficient is 2 & permil; - 3‰ , such expansion value, on the up and down direction, will not result in assembled with the ground floor empty; On the left and right, two split seams of the floor is not fit tightly together, but have a certain gap, ensures that every two split the expansion of the floor; Around plus field reserved expansion area, to ensure that the use effect of the entire site.
10. Foundation problems
each movement assembled at the bottom of the floor is 676 valid point, on the one hand, has played a very good shock absorption, cushioning effect, on the other hand also make sports strength evenly scattered in all directions. In this way, if I have a little pit on site, regardless of the little hole in what position, will not affect assembly floor balanced force. If is obvious pit, drums, is sure to deal with before construction.