CSSSLD plastic product factory specialized in plastic injection, a professional plastic extrusion manufacturer and plastic injection factory since 1997.

ShIP to

others

Plastic mold industry lags behind six reasons

by:CSSSLD     2021-01-23
Looking to the future, because generally good international and domestic macroeconomic environment, the domestic plastic mold industry in major users will continue at a rapid rate, plastic mold will continue to rapid development. In developing the plastic mold was developed with the development of plastic industry. Plastic products development, inevitable requirement plastic mold development. Automotive, home appliances, office supplies, industrial appliances, building materials, electronic communications and other plastic products are mainly users are high in recent years, rapid development, therefore, plastic mold and rapid development. At present the main problems through exchanges and cooperation at home and abroad, through the joint efforts of the whole industry, through the various aspects of mutual support, will gradually get better solution. Need plastic mould industry and its development in our country compared with foreign advanced level, there are also some problems. The unbalanced development, the product overall level is low. While individual enterprise products has reached a quite high level, individual companies of some products has reached or close to the international level, but overall, the mold precision, cavity indices such as surface roughness, the production cycle, the life has bigger gap compared with foreign advanced level. Including the mode of production and the overall level of enterprise management, compared with foreign developed countries have more than 10 years. Two process equipment backward, organization and coordination ability is poor. Although some enterprises after the technical transformation of recent years, technological equipment level is advanced, but most of the business is still relatively backward technology and equipment. More main is our enterprise organization coordinated ability is poor, hard integrate well or transfer the use of social resources, thus it will be difficult to undertake large projects. The three most enterprise development ability. On the one hand, technical personnel ratio is low, the level is not high, on the other hand is less scientific research and development investment, more important concept behind, did not attach enough importance to the development. Four management lags behind more than outdated technology. Outdated technology often easy to see, backward management sometimes it is difficult to realize. Mould enterprise management at home and abroad on the gap is very obvious, the management of the gap is caused by the problems tend to be more severe than those of the technology gap. Five market demand, production development is difficult to keep up with for a while, at that time is difficult to solve contradiction between supply and demand, the demand situation will continue for a period of time, especially in upscale product contradiction is more outstanding. Six it will take time for the on the solution of the system and personnel problems. In the socialist market economy, in the process of economic globalization, the competitive industries, especially like the mould depends on the particular user, need to single production industry, many enterprises the present system and operating mechanism is still difficult to adapt to the changing market. The number and quality level of talent also can't keep up with the fast development of the industry. Although all trying to solve the two problems, but to get a better solution is yet to be time.
Custom message
这里可以自定义设置
Chat Online 编辑模式下无法使用
Leave Your Message inputting...
Hi, if haven't replied in time, please send us email by: fish@csssld.com. Thank you!