CSSSLD plastic product factory specialized in plastic injection, a professional plastic extrusion manufacturer and plastic injection factory since 1997.

ShIP to

others

Plastic mould processing time need how long?

by:CSSSLD     2021-01-23
Early in the plastic mold development, how long does it take to mould manufacturing is our client's care. Whether electronic products, medical products on the market and environmental protection equipment, there will be updated every day, said that time is money also not line, more like the life of the enterprise, I think it is mostly by entrepreneurs.
how long will it take me about plastic mould processing, this problem cannot treat as the same, from multiple factors, such as product structure processing difficulty level, customer product requirements, product material properties and the minimum quantity of an order for mould products, namely open cavity number. Changshu smoothly da plastic products factory is a collection of plastic mold manufacturing and injection molding processing as one of the modern enterprise. Since its inception the company has been good faith honesty, commitment as gold business philosophy to build a professional brand, professional quality team, keep improving working attitude, continuous innovation, the pursuit of excellence. Years of experience summary tell us how to respond to customer's question about the mould manufacturing time. Today we'll simply explain for everybody, how long does it take to plastic mold processing.


plastic mould processing production cycle is through rigorous scientific computing, can't just take head literally report to the customer number. It mainly depends on the design of the product structure complexity, size, precision, quantity demand, product performance, etc.


1, the product requirements: the requirements of different customers on the products must be different, the appearance of the designed surface is the surface is smooth or mirror, all these affect the plastic mold production cycle.


2, product size: yes, the size, the greater the plastic mould processing cycle will be longer accordingly. With the relative spare parts processing time will be longer.


3, product structure: refers to the structure of the plastic sample customer provided the difficulty, general understanding of it this way: the more complex shape of plastic parts, production mold more difficult. Technically, the more parting surface plastic parts, assembly, button bits, hole, rib, the more the greater the processing difficulty accordingly, divers, mold making time will be extended accordingly. Generally speaking, the mould structure as long as the more complex, the quality also will be lower, the greater the processing difficulty, trouble spots are, the more effect to the final product is the slower.


4, mold cavity number, which is a set of mould with several holes, a set of mould to produce several products, product market is depend on customers, make two products with a sure there is a difference between products, processing time will also is not the same. Normally, new products since the market is still not fully open, the market demand for this product is not so big, the mold cavity number is not so much, and can guarantee market supply, is the highest cost performance. Product market cultivation, of course, after the mature, the mould cavity, affirmation is to increase the number of it depends on the demand of the market to determine whether to make the change of the cavity number, to feedback the demand of the market.


5, and material properties of products: our products often have special requirements, the mould steel requirements and processing requirements are different, such as we did the PC and the early stage of the macro technology ceramic mould, and ceramic insulation is the purpose of fire prevention, general use on the led lighting. Is different to mold requirement, mold need to be hardened, hardened after secondary CNC precision grinding machine, it will be more difficult to subsequent processing link, will naturally be a little time, and some mould for anti-corrosion or soft rubber mold, requirements will be different, manufacturing processing technology will be more complicated.
Custom message
这里可以自定义设置
Chat Online 编辑模式下无法使用
Leave Your Message inputting...
Hi, if haven't replied in time, please send us email by: fish@csssld.com. Thank you!