CSSSLD plastic product factory specialized in plastic injection, a professional plastic extrusion manufacturer and plastic injection factory since 1997.

ShIP to

others

PVC corner trough installation method

by:CSSSLD     2021-02-03
Corner trough

the corner decoration trough, is my company's patent product. In bedroom design, molding, shade horn line, line to play the role of a walk line to receive wires, using their material and shape. Color and indoor photograph echo, can have adornment effect. Trough another role is to protect and to receive bare in the wire, thus reducing the damage of the wires.



the corner trough installation

1. Ground in the corner installation: to install the ground of the slot wall should be clean, put the base of the slot with the lid open, tear the base with back glue, back glue side to stick on the ground ( Pay attention to the direction) , no lamination of the side stick on the wall ( Note: the back glue side to have a distance with the ground) , both hands hold the push down, and place them on the ground, press the let back adhesive. Tidy up the wire into the base, then cover the lid, close to the wall just press down, close to the ground to the direction of the corner of the room, let the lid tightly.



2. Smallpox apex Angle installation: first, open the cover of the slot, and tear up the base back glue, on the base on nail glue, free in the post you push hard on the apex Angle there. Avoid nail glue have a solidification process, such as it did to put to put first in again, the need to install the lid edge finishing line, good place you push hard on the lid, the lid fastening. ( Use the free nail glue or nailing fixation)



the floor trough installation

1. Above ground installation, the first floor clean, open the cover of the slot, tear will base on the back glue stick to the ground, press the spare parts for cement, put the need to tidy up the line into the base, cover with lid, you push hard on the, make the lid fasten the base.



2. Metope installed: first, open the cover of the slot, installed on the wall need nailing fixation in order to avoid falling, on the base will line into play after the nail. When need to install the lid edge finishing line, finishing a good place you push hard on the lid to fasten the base. ( Use the free nail glue or nailing fixation)



options

our company has three kinds of specifications of the slot corner to choose from:


SW - 35 specification: 25 & times; 25 ( mm)


SW- 50 specification: 25. 5× 34 ( mm)


SW- 60 specifications: 45 & times; 45 ( mm)

color: color choices for the corner trough, our company has three gray, white, rice white. Other solid color, bright color, walnut color, teak color, annatto color four imitation wood grain color options ( Color can be customized) Other trough




arc floor trough
1. Specification: SWD - 30、SWD- 50、SWD- 70、SWD- 90、SWD- 120
2. Color: white, rice white, gray, shallow color, teak, walnut color, annatto color color ( Can be customized)



square trough
1. Specification: 20 mm * 10 mm and 24 mm 39 mm * * 14 mm, 19 mm, 59 mm * 23 mm, 100 mm * 29 mm
2. Installation: open the lid, with a free nail glue or nail fixed base, then within the line into the base, packed the lid, you push hard on the button to ensure that the lid and base.
Custom message
这里可以自定义设置
Chat Online 编辑模式下无法使用
Leave Your Message inputting...